From: route@monster.com
Sent: Tuesday, June 14, 2016 5:16 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: IMS Integration
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Mahmoud Ellabban Radio Access Network Principal Engineer Educational Degree:Masters in Telecom, Institute National Polytechnique Grenoble-
France Home Address:4707 Club Terrace Ln, Frisco, Tx, 75034 Personal Email:mahmoud.labban@gmail.com Telephone Number:+1 214-600-0650 Citizenship:United States of America
EXPERIENCE v RAN Solution
Architect – AIRCOM INTL (TEOCO) – Texas (September 2013 – Present): Project
1: VERIZON WIRELESS – LTE eMBMS Multicast Lead –PDI Team– March 2015 till
date: · Lead
and Train regional markets to Test and Deploy eMBMS service on Cloud (ALU and
Ericsson). · Full
understanding of End to End network setup and configuration for Core and RAN
nodes (BMSC, BVPS, MME, Cisco and ALU Routers 7750 and 7705) · Design
eMBMS Configuration (SDCH, rfAllocation, MBSFN ID, SAID, RB Allocation,etc…in
correlation with capacity consideration). · Optimize
Unicast and Multicast LTE Services to improve SINR/BLER and other performance
KPIs Project
2: SPRINT - Backhaul Circuit Data Analytics & Optimization Lead_Nov 2014
– Feb 2015: · Evaluate
and analyze Sprint current backhaul, trunk, and high capacity access
facilities networks (DS0, DS1, DS3, OC) by market or LATA. · Evaluate
completed and forecasted conversions to client’s new technology footprint and
identify facilities that can be completely eliminated or consolidated to
other facilities. · Carrier
Access Billing and Access Tariffs Knowledge · SONAR
and Access DB Query usage to pull traffic report and billing items needed for
Audit. Project
3: AT&T - LTE LCQI cluster improvement Optimization Lead – LA Market –
June to Nov 2014 · Conducting
Trials for LCQI improvement especially DL Throughput and Load Balancing · Daily
Cluster Monitoring and Parameter Tuning for Worst KPIs offenders · Weekly
meeting for Cluster LCQI progress. · Guidelines
for Proper handover and Reselection procedures and parameter settings. · VOLTE
Pre-launch Optimization, SIP message analysis Project
4- SPRINT - Radio Frequency Manager– DFW market – Jan to May 2014: · Understanding
customer requirements and turning them into functional tasks. · Defining
project deliverables and reviewing Scope Of Work · Developing
solutions that resolve customer network problems and improve the performance
of 3G and LTE on E// and ALU vendors · Coaching
Local team and Leading the Analysis and Troubleshooting of the 3G and 4G LTE
network Events for several projects using the best practices experience.
Troubleshooting included Blocked Calls, Dropped Calls, Low Radio Throughput,
Handoff Failure, etc… · IMS
and VOLTE Features Testing Process preparation. · Setting
up Post Cluster Launch Methods and Procedures. v LTE
Subject Matter Expert – T-Mobile – California-USA (May 2013 – August 2013): LTE Radio Design, Initial
Tuning and Optimization Technical Lead T-Mobile
(South California and San Diego Market) Subject Matter Expert: ·
Coaching the Local Teams and transferring the
Technology knowledge to the regional Engineers ·
Setting Up Procedures for Tuning and
Optimization ·
Pre Launch Rollout Audit and Monitoring ·
Post-Launch Optimization and Network
Performance Monitoring ·
Weekly Meeting with Engineers and Management
for following up the Network improvement ·
VOLTE Features Testing and Trial. ·
Rehome and Software upgrades ·
Creating scripts for tuned parameters settings
to improve the Accessibility and Retainability ·
Procedures to improve DL Throughput for better
user. v
LTE Technical Design & Optimization Lead – AT&T California -
USA (Sep 2011 – May 2013): LTE Radio Design, Initial
Tuning and Optimization, Western
Region Technical Leader AT&T -
USA (Sept. 2011 – May
2013) ·LTE Radio
Network Tuning and Optimization ·
AT&T LTE Radio Network GOLD Standard Parameters Testing. ·
VOLTE Testing, L3 messages, RTP/RTCP protocol ·
VOLTE Metrics and KPIs definitions ·
UETR, X2 and S1 Transmission Interface tracing and L3 messages
Analysis. Alarms, Discrepancy Audit and HW troubleshooting. ·
Coordination and Weekly/Monthly Reporting to AT&T Management
entities. ·
Drive Test Analysis. Performance Counter KPIs Definition.
Performance Monitoring and Parameters change for Optimization purpose ·
Intra LTE / Inter LTE and IRAT Handover testing with Samsung / LG
for 2 and 3 LTE Carriers on Different bands. ·Customer Knowledge Sharing Presentation
Preparation ·
LTE Background, Attraction Aspects, LTE System Architecture,
Tuning Procedures, Golden Cluster Definition, LTE Parameters, KPIs, Features ·LTE Radio
Network Design Activities ·
PCI/TAC Planning, Neighbor Definition, RFDS preparation, ·
Atoll Simulation for RSRP, RSRQ, SINR, RLC Throughput. ·
ACP tool usage ·
Link Budget preparation ·
Montecarlo Simulation v
ERICSSON-INC, Radio
Access Network Expert (Sept 2007 - Sep 2011): Project
1: WCDMA / LTE Network Performance Improvement, San
Francisco Market Lead – California USA AT&T - USA (Apr.
2010 – Dec. 2010) ·
WCDMA and LTE Radio network Performance
Improvement, KPI Monitoring, and Parameter Optimization & LTE Pre-Launch
Tuning. ·
Customer Meetings and weekly customer
Performance report preparation and presentation. ·
Cluster Post Launch Optimization, Directed
Retry, IRAT, Load Sharing (between different carriers), IFHO, Neighbors,
Power, GPEH Analysis. ·
OSS RC - WNCS and WMRR Neighbor work, Alarms,
HW issues monitoring and addressing to other groups ·
Sites Re-homing and SW upgrade performance
monitoring. Project
2: HSDPA and Multi Carrier Optimization Consultant Meditelecom -
Morocco (Jan 2010
– March 2010) ·
Second carrier implementation, Load Sharing
parameter settings and Optimization. ·
HSPA implementation, KPI setting and parameter
Tuning, Service Based Handover Feature implementation ·
Setting up GPEH, UETR, UEH traces and Trace
Analysis using TEMS-Visualization. ·
Drive Test Analysis using TEMS-investigation. ·
Weekly customer meeting and reporting Project
3: WCDMA Optimization and
Performance Team Leader Vodafone - Netherlands (April 2009
– Jan 2010) ·
Coverage and Capacity Predictions using Atoll. ·
KPI formulae setting for Performance monitoring
on Business Object. ·
E2E Parameter Optimization for improving
Admission, Congestion, Handover, special events, Hot Spots, Load Sharing ·
New Sites performance and alarms monitoring
including Neighbors Optimization and necessity for SW/HW upgrade ·
Moshell Scripts Running and GPEH Tracing and
Analysis. ·
Weekly Performance Report and recommendations
to Vodafone. Project
4: 3G Network Optimization
Consultant Etisalat
Operator (Mobily)- KSA
(Oct 2007 – Feb 2009) ·
3G Design, Optimization and Performance
Improvement (New sites Design, Drive test analysis, Troubleshooting pilot
pollution, low RSCP/EcNo ·
Features implementation and Parameters Tuning
for improving network performance. ·
Iur Integration, Second Carrier implementation,
HSDPA and HSUPA launch. ·
Setting Accessibility, Retainability, Data
Rate, Throughput KPI formulae for CS, Packet, HSPA Services ·
CS, PS & HS Testing, Performance monitoring
and analyzing for better Network performance. ·
Dropped calls Reason investigation, Blocked
Calls Reasons (low RRC and RAB success Rate). ·
Low SHOv and IRAT Hov Reasons, Low throughput
Reason. ·
Enabling Tracing (CTR, UETR, GPEH…) and
analyzing them. ·
Weekly customer reporting for Suggestion and
Recommendation including Physical Changes (Tilt, Azimuth, TMA, etc…), Alarms
and HW ·
failures, HW upgrades, Admission Control
Parameter Changes, Congestion Control Parameter Changes, Neighbor
Optimization. v NSN – Senior RF Network Engineer
(February 2004 – August 2007): Project
1: UMTS RF Consultant STC - KSA(May 2006
– August 2007) ·Parameters Optimization, HSDPA parameter and counter settings,
Timers changing, Activating and deactivating features. ·
IMSI traces Analyses and Uu traces
Analyses using ACTIX software, this includes: ·
Coverage Analysis and Quality Analysis for HSDPA in addition to
the CS & PS services. ·
Event Analysis for HSDPA and R.99 traffic (Drop calls, call setup
failures…) ·
Layer 1/3 Message Analysis. Protocol Stack Analysis (HSDPA &
R.99) ·
Recommendations for solving dropped calls, Pilot pollution,
missing neighbor, tilt setting, QoS (KPI verification): ·
Counters and KPI formulas discussion with customer, Reporting
& Analyzing worst cells and suggesting modifications ·
Coverage Statistics Monitoring (RSCP and EcIo average/MOC, MTC,
MMC setup time). ·
Accessibility Statistics (CSSR, RRC Connection Success Rate, RAB
Success Rate), Retainability Statistics (Drop Call Rate). ·
Mobility Statistics (SHO Success rate, Inter RAT HO success rate,
CCO) and Integrity Statistics (Average Data rate for PS services) ·
Drive test team leading and coordinating Project
2: CDMA Design and Planning Engineer Vodafone – Germany (Sep. 2005
– March 2006) ·
Design and propose the nominal Radio plan of 3G
network service including HSPA. ·
Estimate Radio network elements &
configurations to be implemented for traffic handling. ·
Traffic Model Generation, Link Budget
Calculations, HW Dimensioning and Indoor/hot Spot/VIP consideration to define
exact number of sites. ·
Scrambling Code planning, URA, LAC, NodeBid,
Cellid, CPICH power, tcell, Neighbor Planning ·
ASSET 3G planning tool used for site locations
definition and several Coverage Plots and Monte Carlo Simulations
preparations for PS/HSPA ·
NPR and NDR (Network Planning and Network
Design Report) preparation and Discussing them with Customer. Project 3: GSM
Network Optimization and Field Engineering STC - KSA (Feb. 2004 – Aug.
2004) ·
Preparing weekly and Monthly field optimization
reports using TEMS Investigation ·
Initial and Final Site survey, Site Auditing,
Site Investigation, RF site surveying (Prepared Site Survey Reports, RSD/SARF
reports) ·
Roaming Test between two operators v TRAININGS ØManagement and
Technical Training Courses ·
LTE Optimization Workshop,
LTE Radio Network
Functionality. ·
LTE Air Interface and Protocols &
Procedures. ·
WCDMA Protocols and Procedures, WCDMA Radio Network Functionality ·
N&TC Radio Seminar – Langkawi,
Malaysia [W10, LTE technology] ·
Service Delivery Competence
Management WCDMA Air
Interface ·
Competence Management, Security Sally, SMS, Primus, Service Delivery Career Model v Skills: Major Computer
Skills and Tools: ·
Mapinfo,
Geolocation GIS ·
Asset
Design Tool, Atoll, ACP ·
ACTIX ·
TEMS
Products ·
OPTIMA
Performance Tools, Business Object ·
Excel,
word, Access ·
SQL
and C++ |
||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|